High rise construction

Core Torre Marina

Country: Italy Year of execution: 2009/2010 Main Contractor: Edilstrade Group Height: 51,43 m Surface: 9.140 m² Run/m: 177,65 m More

IBG-Kantoor Groningen

Execution of 2 high-rise cores Country: Netherlands Year of execution: 2009 Main Contractor: Strukton Civiel Projekten bv Height: 48,0 / 95,0 m Surface: 6.960,0 m² / 16.435,0 m² Core 1: 145 run/m Core 2: 173 run/m More

National Stadium Warschau

Country Poland / Year of execution: 2009 Slipforming of 10 stair cores for the new football stadium in Warschau Main Contractro: Alpine Bau Deutschland AG Berlin Height: 24,0 - 38,0 m / ca. 200 runm of form Surface: 45.000 m² More

Hochhausgebäude in Hanoi

5 Hochhauskerne in Gleitschalung ausgeführt More

High-Rise Building Vienna Twin Tower

2 cores slipformed in alternating cycle concrete B500 More

High-Rise Building Neue Donau

Total 34 floors - high density concrete. 2 Basements - entresol B500, 1st - 16th floor B400, 17th - 34th floor B300. More

High-Rise Building Mondriaantoren

approx. 280 nos prefabricated concrete beams 32 nos floors. High density concrete (first 6 floors B95/65, others B 45) More

High-Rise Building IZD - Tower

The IZD Tower is a 45 storey high rise project in the middle of Vienna. More

High-Rise Building Gerling

Slipform of the 12 staircases for the high-rise building. More

High-Rise Building Delbrück

1st slipform unit: pre-slipforming of 4 cores up to 37.0 m. Fabrication of floor slabs and crane anchorage. 2nd slipform unit from 37,0 m up to 63,0 m More

High-Rise Building Canary Wharf DS1

run/m form: 395 m 19 floors More

High-Rise Building Canary Wharf HQ1

run/m form 42 m each Three cores - main core, north and south core More

High Rise Building Telekom-Center Munich

Temporary butresses for construction level. More

Cores Manchester

Core 1/3: 4,22 x 5,08 m on plan. Core 2/4: 2,275 x 9,95 m on plan. 12 hrs slipforming, average speed: 2,2 m / 12h hrs More

Cores Mahler 4 - UN Studio

2 cores / 205 run/m form More

Core Inholland Rotterdam

1 core / 134 run/m form More

Atlantic House

Slipforming of 2 nos. cores together (21 days) More

High-Rise Building Arthur Street

Outside dimensions: south core 12,8 x 3,8 m / north cores (2 nos) 5,6 x 3,77 m. Run/m form: South core 84 / north cores 64 m GBG's scope - slipform / openings + steel plates More

National Netherlands High Rise

slipforming of the staircaises More

Stadttor Düsseldorf

2 staircores, base geometry: 8,80 m x 5,46 m Precast elements for internal staircase More