Gleitbau Salzburg is proud of a long tradition of international experience in formwork engineering. However, we try hard never to stand still and to constantly develop new techniques and possibilities in concrete construction.

Gleitbau presents some of its solutions of formwork engineering:

Airport Control Tower Salzburg

Country: Salzburg / Austria Year of execution: 2011 Client / Main Contractor: Bodner Bau Height: 50,14 m Surface: 4.705 m² lm of form: 93,83 lm

Port Mann Highway Bridge

Country: Canada Year of Execution: 2009 Client / Main Contractor: Kiewit / British Columbia Gatway Project Höhe: 35 m bzw. 37 m Execution of 2 bridge pylons by means of slipforming technique

Electrabel Maasvlakte - 8 Coal Silos

Country: The Netherlands Year of execution: 2011 Main Contractor: Visser & Smit Bouw bv Execution of 8 coal silos by means of slipforming technique Volume: 20,5 m³ / silo Surface: 5.375 m² / silo Height: 43,0 m each

Ineos Oxide Antwerpen

Country: Belgien Year of execution: 2011 Main Contractor: CEI de Meyer nv Execution of an ethylen tank by means of slipforming technique Height: 33,37 m Surface: 10.500 m² Inside diameter: 49,0 m Wall thickness: 0,6 m run/m of form: 315 lm

Chimney Samara

Country: Russia Year of execution: 2011 Main Contractor: JSK Korta Execution of a conical chimney by means of slipforming technique Height: 150,0 m External diameter: bottom 14,0 m, on top 5,35 m Surface: 7.853,0 m Wall thickness: 0,45 / 0,...

Chimney MVA Torino

Country: Italy Year of execution: 2011 Main Contractor: Coopsette Execution of a zylindrical chimney by means of slipforming technique Dimensions: 13,20 x 10,13 m Height: 120,60 m Surface: 10.510 m² Wall thickness: 0,5 / 0,4 m

Sugar Silo Agrana Tulln

Country: Austria Year of execution: 2011 Client/Main Contractor: Strabag AG Height: 51,75 m Surface: 19.872 m² Run/m form: 384 run/m Diameter: outside 49,8 m / inside 49,0 m

Chimney Yanbu

Country: Saudi Arabia Year of execution: 2010/2011 Client/ Main Contractor: CRI International S.r.l. / Italy Lifting of 3 plattforms and 2 liners Platforms: 134,0 / 80,0 / 40,0 m Liner: 150,0 m Lifting weight: Plattforms: 35 / 10 / 10 t...

Absorber Lünen

Execution of slipforming works Country: Germany Year of execution: 2010 Client / Main Contractor: Pleus Grundwasser- und Bodenschutz GmbH Height: 37,02 m Surface: ca. 3.811 m² Wall thickness: 0,35 m In addition, 2 silos had been perfomed...

Sakhalin I Öl- and Gasplatform

Year of execution: 2010/2011 Main Contractor / Client: Aker Solutions / Aker Advantage / Exxon Mobile Country: Nakhodka / Russia Construction of caissons and shafts for a GBS Oil- and Gasplatform. In the first construction phase the caisson...